Survey the fixing conditions
We inspect dimensions, substrate, access, permitted fixing points, exposure and any restrictions on drilling or permanent attachment.
Timber · concrete ballast · frames · façades
Finish the job with a banner that sits tight and stays secure. We plan access, fixing points, support, ballast and edge reinforcement before the installation crew arrives.

One accountable team
Start with a site, a campaign requirement or supplied artwork. We turn it into a clear specification for production, finishing, packing and installation.
See the production routeOutputs
Production details
Material to installation


Production route
We inspect dimensions, substrate, access, permitted fixing points, exposure and any restrictions on drilling or permanent attachment.
Banner reinforcement, frame, timber bracing, ballast and hardware are specified together around the surveyed site.
The crew positions, tensions and secures the banner, checks the perimeter and records any agreed removal or replacement requirement.
Frequently asked
Ballast may be used for temporary freestanding support where the approved site plan does not permit permanent fixing. The requirement depends on the structure and location.
We can assess it, but the finished dimensions, edge reinforcement and fixing details must be suitable for the surveyed site before installation is accepted.
A survey is recommended whenever access, structure, façade conditions, wind exposure or fixing permissions affect the installation.
Yes. Creativity Sequence can coordinate surveyed installation, replacement and removal across Saudi Arabia within the confirmed site scope.
Request a production plan
Share the dimensions, quantity, site, artwork status and deadline for banner fixing. We will confirm the material, production route and installation scope.